Home Savings CalculatorHome Savings Calculator

Decking Calculator

Work out how many deck boards, joists and screws your deck needs — from its size, the boards you have chosen and the joist spacing.

Your Inputs

L
W
mm
m
mm
%
£/board

Decking Materials

Live
Deck boards to buy
47
21 rows × 2 boards, +10%12.00 m² of deck
MaterialsQuantity
Deck boards47 boards
Board length total169.2 m
Joists (400mm centres)11 × 3.00 m
Joist length total33.0 m
Decking screws924 screws
Deck area12.00 m²4 × 3 m
Board rows21at 149mm each
Joists11at 400mm centres
Board cost—add a price per board

About this estimate

  • Boards, joists and screws from one measurement
  • Allows for the expansion gap between boards
  • Adds your wastage allowance to the board count
  • Optional cost from your price per board
  • No personal data required

Estimate only. Follow the board manufacturer’s fixing and span guidance, and check whether your deck needs planning permission or Building Regulations approval.

How the quantities are worked out

  • Each board covers its own width plus the expansion gap
  • Rows = deck width ÷ that covered width
  • Boards per row = deck length ÷ board length, rounded up
  • Joists = deck length ÷ spacing, plus one for the end
  • Screws = two at every point a board crosses a joist

Board and joist counts round up to whole pieces, because that is how timber is sold. Check the board maker’s span table before widening the joist spacing — it is what the guarantee relies on.

How to work out how many decking boards you need

Decking is bought as boards, not square metres, so the useful question is how many boards — and that depends on the gap between them as much as on the size of the deck. This decking calculator counts the rows, the boards in each row, the joists underneath and the screws that hold it all together.

Start with the covered width

A board covers its own width plus the expansion gap beside it. A 144mm board with a 5mm gap covers 149mm of deck, so a 3m wide deck needs 3,000 ÷ 149 = 20.1, rounded up to 21 rows.

Then count boards per row

Each row runs the length of the deck. A 4m deck laid with 3.6m boards needs two boards per row, with the second cut down — which is where most of the offcuts come from.

Add wastage last

21 rows × 2 boards is 42 boards. With 10% for cuts and the occasional warped board, the order becomes 47. Wastage goes on the board count, not the area, because you buy whole boards.

Worked example: a 4m × 3m deck

144mm boards, 3.6m long, 5mm gaps, joists at 400mm centres, 10% wastage.

ItemHow it is worked outQuantity
Deck boards21 rows × 2 boards + 10%47 boards
Board length total47 × 3.6m169.2 m
Joists4m ÷ 0.4m, plus one end joist11 × 3.00 m
Joist length total11 × 3m33.0 m
Decking screws42 boards × 11 joists × 2924 screws

12 m² of deck. Narrower 120mm boards would need 24 rows and 53 boards for the same deck — more boards, more screws, more labour.

Joists, spacing and span

Why spacing matters

Joists at 400mm centres are the usual starting point for softwood boards laid straight across. Widening them to 600mm cuts this deck from 11 joists to 7 and the screws from 924 to 588, but the boards flex more between supports, and most manufacturers’ warranties set a maximum span.

Composite and diagonal decks

Composite boards are generally less stiff than timber and need closer spacing. Laying boards diagonally increases the span between joists by about 40%, so the spacing has to tighten to compensate. Check the board’s span table before you buy the frame timber.

The gap between boards

Wet timber shrinks

Pressure-treated boards often arrive damp and shrink as they dry, so a 5mm gap set on wet boards can open to 8mm or more. Dry boards, or boards stored under cover for a few weeks, can be fixed at the gap you actually want.

The gap changes the board count

The gap is part of the covered width, so it changes how many rows you need. Going from 5mm to 10mm on this deck drops the covered width from 149mm to 154mm — fewer rows, slightly fewer boards, and a deck that drains better.

What else the job needs

Frame and base

Beyond boards and joists you need posts or bearers, joist hangers or brackets, and something solid under them. Concrete pads or post holes are priced with the concrete calculator, and a compacted sub-base under a ground-level deck with the gravel calculator.

Fixings and finishing

Use decking screws rated for outdoor use — stainless or coated — because ordinary screws stain treated timber. Add fascia boards for the edges, and a cut-end treatment: every cut exposes untreated timber, which is where rot usually starts.

Before you order

Measure the deck you can actually build, not the one you sketched: check where the door threshold sits, how the deck meets the lawn, and whether a step is needed. Decks over 300mm high, or those that take up a large share of a garden, can need planning permission, and decking attached to a building may fall under Building Regulations.

For the wider budget, including the bits that are easy to forget, see budgeting a renovation. To measure an awkward-shaped deck, split it into rectangles with the square meter calculator first.

Frequently asked questions