Home Savings CalculatorHome Savings Calculator

Room Renovation Cost Calculator

Price up decorating and flooring for a single room — materials and labour, split out separately, before you get quotes.

Your Inputs

m²
m²
coats
days
£

Your Renovation Cost

Live
Total project cost
£1,728
£848 materials£880 labour
Cost by StageCumulative cost
£0£500£1k£2k£2k0Paint → Flooring → Labour
Paint needed12.0 L£288
Flooring20 m²£560
Labour£8804 days
Cost per m²£86of floor area
Materials £848 (49%)Labour £880

About this estimate

  • Based on current UK material pricesUpdated 29 August 2026
  • Separates materials from labour
  • Three quality tiers for paint and flooring
  • Excludes prep, waste removal and trade margin
  • No personal data required

Estimate only — not a quote. Excludes preparation, waste removal, structural work and trade margin. Always get quotes before committing.

How the estimate is built

  • Paint needed = wall area × coats ÷ coverage per litre
  • Flooring = floor area × price per square metre
  • Materials priced at your chosen quality tier
  • Labour = days on site × day rate
  • Materials and labour are then shown separately

Covers decorating and flooring only. Structural work, rewiring, plastering and plumbing are quoted job by job and are not included here.

How to estimate a room renovation

Most room makeovers come down to walls, floor and time. This room renovation cost calculator prices the paint for your wall area, the flooring for your floor area, and the labour days to do it, at budget, mid-range or premium quality — then shows materials and labour separately, because that split is where quotes differ most.

Walls

Paint = wall area × coats ÷ 10 m² per litre. A typical double bedroom has around 60 m² of wall once you multiply the perimeter by the ceiling height. Two coats is 12 litres.

Floor

Flooring = floor area × price per m² for your quality tier. Measure length × width; add a little for cuts if the room has alcoves or bays.

Labour

Labour = days on site × day rate. A decorator and a flooring fitter charging around £220 a day will often spend four days on a room including preparation.

Worked example: a double bedroom

60 m² of wall, two coats, a 16 m² floor and four days of labour.

QualityPaint (12 L)Flooring (16 m²)Labour (4 days)Total
Budget£144£224£880£1,248
Mid-range£288£448£880£1,616
Premium£492£832£880£2,204

Labour is more than half the mid-range total. Doing the work yourself leaves the materials — but allow for tools, dust sheets, filler and your own time.

Why real quotes come in higher

Preparation

Filling cracks, sanding, masking, removing old wallpaper and lifting the old floor all take time before the visible work starts. On an older house, preparation can take as long as the painting.

Woodwork, ceilings and extras

Skirting boards, door frames, radiators and ceilings take extra paint and labour. Use the paint calculator to add them, and allow for skips, parking and VAT if your trades are registered.

Contingency

Keep 10–15% aside for surprises: blown plaster, a damaged subfloor, or a change of plan halfway through. Our guide to budgeting a renovation explains how to make the number survive the job.

Bathrooms and kitchens

What this calculator does not cover

This calculator covers decorating and flooring. A bathroom or kitchen renovation also involves plumbing, electrics, plastering, sanitaryware or units, and often tiling. Those vary so much between jobs that they need a quote from a fitter.

Parts you can still estimate

Use the tile calculator for wall and floor tiling, and the flooring calculator to compare LVT or vinyl for a waterproof floor. That gives you a solid number for the finishes before the fitter prices the rest.

DIY or hire in?

What doing it yourself saves

In the mid-range example, materials are £736 and labour £880. Doing the work yourself saves the £880 — 54% of the total. Set labour days to zero in the calculator to see your materials-only figure.

That saving is real, but budget for rollers, brushes, a mitre saw or knee pads, and for taking longer than a trade would.

Where a trade earns their fee

Straight walls in a bedroom are a reasonable DIY job. Stairwells, high ceilings, solid wood floors and anything involving electrics or plumbing are where professional work saves time, mistakes and sometimes safety risks.

Planning more than one room

Order of work

Do the messy jobs first. Plastering and electrics come before decorating, and decorating comes before new flooring, so paint is not dropped on a new floor. Ceilings are painted before walls, and walls before skirting boards.

Adding up the house

Three bedrooms at the mid-range figure come to £4,848. Hallways and stairs have more wall area than their floor size suggests, so measure them properly rather than treating them as a small room. Tradespeople often price a multi-room job for less per room than a single room.

Choosing a quality tier

The tier changes the price of the paint and the flooring, not the labour. Premium paint often covers better, which can save a coat, and better flooring lasts longer in busy rooms. For bedrooms that get light wear, mid-range is usually the sensible middle. Spend more where wear is heavy — hallways, stairs and kitchens.

Use these figures to set a budget and compare quotes line by line. They are estimates, not a quote.

Frequently asked questions