Home Savings CalculatorHome Savings Calculator

Brick Calculator

Work out how many bricks or blocks a wall needs, plus the sand, cement and wall ties to go with them.

Your Inputs

L
H
m²
%
£each

Wall Materials

Live
Single skin wall
630
bricks incl. 5% wastage10.00 m² at 60 per m²
MaterialsQuantity
Bricks630 bricks
Building sand0.63 tonnes
Cement7 × 25kg bags
Wall tiesnot needed
Wall area10.00 m² net
Gross wall10.00 m²5 × 2 m
Per m²60bricks
Cement7 bags0.63t sand
Cost—add a price each

About this estimate

  • Single skin, double skin or blockwork
  • UK standard brick and block sizes with 10mm joints
  • Sand, cement and wall ties included
  • Optional cost from your price per brick
  • No personal data required

Estimate only. Structural walls, foundations and cavity details must follow Building Regulations and, where relevant, an engineer's design.

How the quantities are worked out

  • Wall area = length × height, minus any openings
  • A single skin needs 60 bricks per m², a double skin 120
  • Blockwork needs 10 blocks per m²
  • Mortar: about 1 tonne of sand and ten 25kg cement bags per 1,000 bricks
  • Cavity walls take about 2.5 wall ties per m²

The 60-per-m² figure already includes the 10mm mortar joints, so never add them again. Mortar quantities are a guide — how much you use depends on joint thickness and how much ends up on the ground.

How many bricks do you need?

Brickwork is counted per square metre of wall face, and the number barely changes from job to job because the brick size does not. This brick calculator takes the wall size, subtracts the openings, and gives the bricks or blocks plus the sand, cement and wall ties that go with them.

Sixty bricks per square metre

A standard UK brick is 215 × 102.5 × 65mm. Add a 10mm mortar joint and each brick occupies 225 × 75mm of wall face, which is 59.3 per m² — the figure everyone rounds to 60. A double skin wall, the two leaves of a cavity, needs 120.

Ten blocks per square metre

A 440 × 215mm block with the same 10mm joints takes up 450 × 225mm, so 9.88 per m², rounded to 10. Blocks cover ground faster, which is why inner leaves and garden walls are often built in block and faced with brick.

The joints are already counted

Because the 60 and 10 figures are worked out from the brick plus its joint, you never add anything for mortar thickness. Adding it again is the most common way a brick order comes out too high.

Worked example: a 5m × 2m wall

10 m² of wall face, 5% wastage for cuts and breakages.

Wall typeUnits per m²Units to orderSandCement
Single skin brick60630 bricks0.63 t7 bags
Double skin brick1201,260 bricks1.26 t13 bags
Blockwork10105 blocks0.63 t7 bags

A double skin wall also needs about 25 wall ties at 2.5 per m². Cement is counted in 25kg bags, mixed roughly 1:5 with building sand.

Mortar, ties and openings

How much mortar

The trade rule of thumb is one tonne of building sand and ten 25kg bags of cement per 1,000 bricks. Thicker joints, frogged bricks laid frog-up and generous buttering all push it higher, and some always ends up on the ground.

Wall ties

Cavity walls need ties between the leaves, about 2.5 per m² at 900mm horizontal and 450mm vertical spacing, plus extra ties down both sides of every opening. Exposed or tall walls need more, so follow the drawings rather than the average.

Doors and windows

Take openings off the wall area: a 2.5 m² opening in this wall drops the order from 630 bricks to 473. Do not expect the full saving in practice, because the cuts around a reveal waste bricks that the area calculation counts as whole.

What the calculator does not cover

Foundations

Every wall needs a footing sized for the ground and the load. Work out the concrete for it with the concrete calculator, and have anything structural specified properly — a garden wall over about a metre high, and any wall carrying a building, is not a guess-and-go job.

Damp courses, lintels and copings

A DPC above ground level, lintels over openings, cavity trays, weep vents and a coping or capping on a free-standing wall are all part of a real order. They are quantified from the drawings rather than the wall area, so add them separately.

Ordering and building

Buy in one go

Bricks vary between batches, and a second delivery months later rarely matches. Order the whole wall at once, including the wastage, and keep a few spares for repairs.

Weather and pace

Mortar does not set properly below about 3°C, and freshly laid work needs covering against rain and frost. Bricklayers also limit how high they build in a day so the wall does not move under its own weight — worth knowing when planning the schedule alongside the rest of the project budget.

Frequently asked questions